These documents record how Workstream's early implementation was planned and validated. They are preserved for traceability. They do not define current priority, implementation status, contribution permission, or a delivery schedule.
For current work, start with CONTRIBUTING.md and follow its
engineering loop. Then use Current v0.1 Status, the code
and tests on main, accepted ADRs, and the canonical subsystem specifications.
- Original 30-Day Master Plan
- Original Day-by-Day Execution Plan
- Original Week 1 Backend Plan
- Original Week 2 Checker Framework Specification
- Original Implementation Backlog
- Submission Packet Foundation
- Checker Contract And Records
- Checker Runner And Registry
- Submission Artifact And Policy Checkers
- Pre-Review Gate
- Checker Trial
- Checker Trial Failure Catalog
These documents preserve design criticism, closure decisions, and adversarial review from the original calendar-planning period. Their recommendations are historical input, not current delivery commitments or implementation status.
- Initial Review Closure
- Architecture Review
- Systems Architecture Review
- Final Architecture Review
- Operations Review
- Product Strategy Review
- Final Product Strategy Review
- Adversarial Quality Review
- Final Adversarial Review
- Process Baseline Operations Review
- Process Pattern Baseline Review
Later canonical specifications and initiative records supersede these files where they describe the same behavior.