Use the Docs Kata rules to collect, review, and maintain documents. The inbox and intake log list material that awaits review. Setup has not checked the inbox documents against the implementation. The current plans section lists reviewed active plans.
- Project README: project entry point, skill list, and attribution.
- Project instructions: rules for the whole repository.
- Evaluation guide: entry point for work in the evaluator.
- Runner handoff: path used by active task handoffs.
The intake log records retained files and exclusions. Retention does not mean that a document has been reviewed or its claims have been verified.
- Jido skills migration backlog:
remaining verification and the archive gate for
agentjido/jido-skills.