Skip to content

Latest commit

 

History

History
149 lines (111 loc) · 4.87 KB

HANDOVER-INDEX.adoc

File metadata and controls

149 lines (111 loc) · 4.87 KB

Handover Index

Status: canonical map of the docs/handover/ suite. Last revised: 2026-05-26.

Each file in this directory is either: - a prompt — a self-contained brief for the next agent to execute a named workstream, OR - a runbook — an operational guide for a now-live workstream, OR - a plan — a multi-sprint coordination document, OR - a state log — running notes from prior sessions.

Read this index first to know which file is which.

Active prompts (next agent picks one to execute)

File Workstream Pre-condition Effort

L1-CAPNPROTO-PROMPT.adoc

Stage 5a — Cap’n Proto IPC

L3 hand-off green ≥ 7 days

~2 sprints

L2-CHAPEL-PROMPT.adoc

Stage 5b — Chapel L2.2+ (speculative search, corpus-parallel, multi-locale)

L1 landed

~4 sprints

L3-LIVE-PROVER-CI-PROMPT.adoc

Stage 5d — Tier-4 live-CI provisioning

Tier-1 main CI green ≥ 7 days

~1 sprint

PHASE-3-PROMPT.adoc

Modal + real-algebraic backends (Wave-2 follow-on)

Wave-2 done

~1 sprint

SUGGEST-CLI-PROMPT.adoc

suggest verb implementation

None

~3 days

PARADISEO-ROADMAP-PROMPT.adoc

ParadisEO roadmap (ECH-01..04, #408, budget-ownership ADR)

Owner picks canonical issue bodies (WP0)

WP1 ~2 days; others vary

Active runbooks (live workstream is in production)

File What it covers

S4-LOOP-CLOSURE-RUNBOOK.adoc

VeriSim learning-loop end-to-end test (just test-s4-loop) and operational verification

S5-VERIFICATION-RUNBOOK.adoc

Trained-GNN-weights verification flow: just train-cpu → /gnn/health → just eval

Plans (multi-sprint coordination)

File Scope

PRODUCTION-WIRING-PLAN.adoc

Three-tier (L1 Cap’n Proto / L2 Chapel / L3 live CI) production-wiring plan. L1 prompt is the executable derivative.

Deferred-work trackers

File Tracks

THEOREM-METADATA-MIGRATION.adoc

Future migration of 8 parser-site structural meta-tags out of Theorem.aspects into a dedicated TheoremKind field. Boundary filter contains the damage; this is hygiene.

State & navigation

File What it is

TODO.adoc

Living backlog. Single source of truth for “what’s next” between sprints. P0–P4 priority bands.

STATE.adoc

Running human-readable state log. Complement to .machine_readable/descriptiles/STATE.a2ml.

README.adoc

Original handover suite intro (older; kept for orientation).

Warmup material

File Audience

llm-warmup-dev.adoc

LLM session warmup for contributors

llm-warmup-user.adoc

LLM session warmup for end-users

Execution order (when starting a fresh sprint)

  1. Read STATE.adoc (or STATE.a2ml) for the current sprint state.

  2. Read TODO.adoc for the prioritised backlog.

  3. Pick the next-up prompt from “Active prompts” whose pre-condition is met.

  4. Execute the prompt; cite this index in commits if you reorder priorities.

  5. When a prompt is “consumed” by completion, retire it into the git-history archive — do not leave consumed prompts alongside active ones.

Stage cross-reference

Maps docs/ROADMAP.adoc stage IDs to the handover artefact that drives each:

Stage Drives Artefact

2a/2c

GNN training + eval

S5-VERIFICATION-RUNBOOK.adoc

3a/3b

Verisim read paths

S4-LOOP-CLOSURE-RUNBOOK.adoc (done)

3c

Outcome emission wiring

Stage-3c plan in chat history (no dedicated handover yet — to be written when work begins)

4c/4d

suggest_tactics GNN ranking

SUGGEST-CLI-PROMPT.adoc

5a

Cap’n Proto IPC

L1-CAPNPROTO-PROMPT.adoc

5b

Chapel L2.2+

L2-CHAPEL-PROMPT.adoc

5d

Tier-4 live CI

L3-LIVE-PROVER-CI-PROMPT.adoc

When this index goes stale

Update conditions: - A prompt is completed → move it to a archive/ subdirectory or delete and note in this file. - A new prompt is added → add a row to the appropriate section. - A stage status changes in docs/ROADMAP.adoc → update the cross-reference table.

Quick check: ls docs/handover/*.md | wc -l should match the number of rows across all tables above. As of 2026-05-26, this file accounts for 13 entries.