Status: canonical map of the docs/handover/ suite. Last revised:
2026-05-26.
Each file in this directory is either: - a prompt — a self-contained brief for the next agent to execute a named workstream, OR - a runbook — an operational guide for a now-live workstream, OR - a plan — a multi-sprint coordination document, OR - a state log — running notes from prior sessions.
Read this index first to know which file is which.
| File | Workstream | Pre-condition | Effort |
|---|---|---|---|
Stage 5a — Cap’n Proto IPC |
L3 hand-off green ≥ 7 days |
~2 sprints |
|
Stage 5b — Chapel L2.2+ (speculative search, corpus-parallel, multi-locale) |
L1 landed |
~4 sprints |
|
Stage 5d — Tier-4 live-CI provisioning |
Tier-1 main CI green ≥ 7 days |
~1 sprint |
|
Modal + real-algebraic backends (Wave-2 follow-on) |
Wave-2 done |
~1 sprint |
|
|
None |
~3 days |
|
ParadisEO roadmap (ECH-01..04, #408, budget-ownership ADR) |
Owner picks canonical issue bodies (WP0) |
WP1 ~2 days; others vary |
| File | What it covers |
|---|---|
VeriSim learning-loop end-to-end test ( |
|
Trained-GNN-weights verification flow: |
| File | Scope |
|---|---|
Three-tier (L1 Cap’n Proto / L2 Chapel / L3 live CI) production-wiring plan. L1 prompt is the executable derivative. |
| File | Tracks |
|---|---|
Future migration of 8 parser-site structural meta-tags out of
|
| File | What it is |
|---|---|
Living backlog. Single source of truth for “what’s next” between sprints. P0–P4 priority bands. |
|
Running human-readable state log.
Complement to |
|
Original handover suite intro (older; kept for orientation). |
| File | Audience |
|---|---|
LLM session warmup for contributors |
|
LLM session warmup for end-users |
-
Read
STATE.adoc(orSTATE.a2ml) for the current sprint state. -
Read
TODO.adocfor the prioritised backlog. -
Pick the next-up prompt from “Active prompts” whose pre-condition is met.
-
Execute the prompt; cite this index in commits if you reorder priorities.
-
When a prompt is “consumed” by completion, retire it into the git-history archive — do not leave consumed prompts alongside active ones.
Maps docs/ROADMAP.adoc stage IDs to the handover artefact that drives
each:
| Stage | Drives | Artefact |
|---|---|---|
2a/2c |
GNN training + eval |
|
3a/3b |
Verisim read paths |
|
3c |
Outcome emission wiring |
Stage-3c plan in chat history (no dedicated handover yet — to be written when work begins) |
4c/4d |
|
|
5a |
Cap’n Proto IPC |
|
5b |
Chapel L2.2+ |
|
5d |
Tier-4 live CI |
|
Update conditions: - A prompt is completed → move it to a archive/
subdirectory or delete and note in this file. - A new prompt is added →
add a row to the appropriate section. - A stage status changes in
docs/ROADMAP.adoc → update the cross-reference table.
Quick check: ls docs/handover/*.md | wc -l should match the number
of rows across all tables above. As of 2026-05-26, this file accounts
for 13 entries.