Skip to content

Milestones

List view

  • Final updates to make sure the system is completely running in the test/acceptance and production environment. Should be tested and accepted.

    Due by November 29, 2026
    22/25 issues closed
  • The UI needs to be updated to be able to: - Login/logout showing how is login in and other session information - TPN and infusions needs to be configured and should be easy to prescribe - Continuous medication - Showing the complete treatment plan and all relevant calculated variables

    Due by October 18, 2026
    9/24 issues closed
  • GenPRES needs to have a mechanism to notify the pharmacy that the parenteral nutrition and continuous medication in the treatment plan for a patient need to be prepared.

    Due by October 4, 2026
  • GenPRES has been developed as a standalone application without any persistence mechanism. To be embedded for the MVPAP2019 project it needs to: - have a SSO connection with the main EHR for authentication and authorization - keep track of user patient sessions - able to store created treatment plans for patients

    Due by September 20, 2026
    53/56 issues closed